Title: HRSG Field Engineer- off site pre-assembly
Location: Louisiana
Start: September
Duration: 9 months
Hours 60 per week, OT after 40 hrs per week.
Expenses: full expenses
R and R: Once per month for a long weekend home.
This is an off-site pre-assembly of the HRSGs. Installation experience/expertise is needed
Scope: Execution of construction works related to the discipline in charge, which are to be compliant with safety, quality, time schedule, and respective budget. This is an off-site build and will advise on the pre-assembly of the units, installation expertise/experience is key.
Roles and Responsibilities
Supervise the positioning of the template and embedded pieces before the concrete pour.
Review heavy lift plan for HRSG modules & drums.
Supervise the assembly of main & secondary steel structures, including access platforms.
Supervise HRSG casing panel, field-insulated joints installation to avoid hot spots
Supervise HRSG modules and drum installation.
Supervise HRSG piping installation, proper positioning of valves & instruments, welding, NDT, heat treatment up to hydro test & preservation.
Prepare hydro test plan & supervise execution.
Prepare flushing of piping systems, chemical cleaning, air or steam blows to meet cleanliness requirements.
Supervise the safety valves and hydro plugs removal.
Perform final audit of HRGS before GT first fire.
Supervise piping thermal insulation.
Supervise paint application.
Provide technical recommendations on installation technique, tools, and resources.
Interface with the HRSG Vendor office.
Participate in the site coordination meeting and schedule a progress review.
Fully acquainted with the site-specific rules, safety regulations, and environmental protection measures, they perform their work accordingly.
Ensuring within the scope of the discipline works that subcontractors are in compliance with the EHS requirements at the site.
Document non-conformities, keep a log, and document the cost of non-quality.
Issue a progress report to the Site Management.