The Berkeley Cogeneration Plant is a 1x1 combined cycle facility powered by an LM2500PJ gas turbine, providing 22–25 MW of electricity and steam directly to the University of California, Berkeley campus. The site includes a steam plant in operation since the 1930s and a cogeneration plant originally constructed in the mid-1980s, together supporting the campus heating distribution system. With 95% availability, the CHP plant serves as the primary steam provider, while auxiliary boilers and the steam plant ensure a consistent, year-round supply to meet campus demand.
The plant has someone going out on leave 9/22 and would like someone to prior around 9/7 to train with the person going out. The duration of the assignment is 2-3 months. Rate of pay is $60 per hr. Per diem is $237 a day.
Berkeley is 25MW single unit Cogen, GE LM2500 DLE, with Terry Turbine (ST). Supports 24-7 operation steam and power to UCB University campus.
1. Overtime for outage related evolutions
2. Technician with knowledge of CEMS
3. Looking for someone to work as an inside & outside operator. Supporting the CRO