Roadtechs.com Nuclear Power Plant Outage Schedule (© Roadtechs, LLC)

Name
Begin date
End date
Resources
Pickering NGS 7
9/14/18
10/23/18
McGuire 2
9/17/18
10/6/18
Robinson
9/17/18
10/12/18
Watts Bar 1
9/17/18
10/14/18
Vogtle 1
9/17/18
10/7/18
Prairie Island 1
They are replacing the generator in unit #1.
9/21/18
10/23/18
Fermi 2
Changing to 24 month fuel during spring 2020 outage
9/24/18
10/23/18
Millstone 2
9/27/18
10/23/18
ANO 2
10/1/18
11/1/18
Cooper
10/1/18
11/9/18
Seabrook
10/1/18
10/28/18
Turkey Point 3
10/1/18
11/14/18
Braidwood 2
10/2/18
10/28/18
Point Beach 2
10/8/18
11/8/18
South Texas Project 1
10/8/18
11/14/18
Palo Verde 2
10/8/18
11/5/18
Salem 2
10/11/18
11/5/18
VC Summer 1
10/12/18
11/10/18
Oconee 1
10/15/18
11/9/18
Peach Bottom 2
10/15/18
11/1/18
Beaver Valley 2
Closing in 2021
10/22/18
11/20/18
Ginna
10/22/18
11/20/18
Palisades
Just announced that they will remain open until 2022. There will be a fall outage in 18.
10/29/18
11/20/18
Surry 2
10/29/18
12/4/18
Dresden 3
10/31/18
11/16/18
Sequoyah 2
11/5/18
12/2/18
Leibstadt
11/16/18
1/7/19
Catawba 1
11/19/18
12/14/18
Comanche Peak 2
11/19/18
12/18/18
Bruce 2
12/3/18
1/16/19
Waterford 3
1/7/19
2/5/19
Diablo Canyon 1
2/4/19
3/8/19
Hatch 2
2/6/19
3/17/19
LaSalle 2
2/6/19
3/12/19
Calvert Cliffs 2
2/13/19
3/6/19
Browns Ferry 2
NRC approved ~155MWe (494MWt) power uprate to take place during 2019 outage.  Total electrical output will be ~1250MWe.
3/4/19
4/7/19
Susquehanna 2
Final unit 2 699' feed water  heater change out alpha,bravo, and charlie.
3/4/19
4/7/19
Laguna Verde 2
3/5/19
4/18/19
North Anna 2
3/5/19
4/9/19
DC Cook 1
This will be the last baffle bolt outage, and the last long outage.
3/6/19
6/3/19
Perry
Closing in 2021
3/11/19
4/7/19
River Bend
3/11/19
4/14/19
Turkey Point 4
3/11/19
4/17/19
Indian Point 3
Unit 3 plant closure projected for April 2021.
3/13/19
4/11/19
Nine Mile Point 1
3/20/19
4/9/19
Vogtle 2
3/21/19
4/14/19
McGuire 1
3/27/19
4/24/19
Quad Cities 1
3/27/19
4/11/19
Pt. Lepreau 1
3/28/19
5/1/19
Bruce B 6
4/8/19
7/3/19
Callaway
4/8/19
5/19/19
Farley 2
4/8/19
4/27/19
Palo Verde 1
4/10/19
5/8/19
Point Beach 1
4/10/19
5/5/19
Sizewell B
4/10/19
5/9/19
Comanche Peak 1
4/11/19
5/5/19
Monticello
4/15/19
5/14/19
Darlington 1
4/16/19
5/10/19
Salem 1
4/16/19
5/15/19
Watts Bar 2
4/16/19
5/20/19
Limerick 2
4/17/19
5/15/19
Millstone 3
4/18/19
5/19/19
Pickering NGS 1
4/19/19
5/28/19
Bruce B 7
5/6/19
6/19/19
Bruce B 5
6/3/19
7/17/19
Darlington 4
7/1/19
7/25/19
Bruce 4
7/29/19
9/11/19
Angra 1
8/1/19
9/17/19
North Anna 1
9/2/19
9/30/19
St Lucie 1
9/3/19
10/1/19
Laguna Verde 1
9/6/19
10/20/19
Catawba 2
9/9/19
10/3/19
South Texas Project 2
9/16/19
10/15/19
ANO 1
9/16/19
10/23/19
Wolf Creek
9/23/19
10/22/19
Farley 1
9/30/19
10/21/19
Palo Verde 3
9/30/19
10/30/19
Sequoyah 1
9/30/19
11/3/19
Braidwood 1
10/1/19
10/18/19
Byron 1
10/2/19
10/20/19
DC Cook 2
10/2/19
10/31/19
Diablo Canyon 2
10/4/19
11/7/19
Hope Creek
10/7/19
10/28/19
Beaver Valley 1
Closing in 2021
10/7/19
11/5/19
Leibstadt (projected)
10/14/19
11/12/19
Pickering NGS 4
10/14/19
11/22/19
Shearon Harris
RFO22 - Rx Head replacement
10/14/19
11/7/19
Prairie Island 2
10/14/19
11/10/19
Surry 1
10/14/19
11/7/19
Peach Bottom 3
10/23/19
11/9/19
Oconee 2
10/28/19
11/22/19
Dresden 2
10/30/19
11/17/19
Bruce B 8
1/6/20
2/19/20
Pickering NGS 6
1/8/20
2/16/20
Bruce 1
1/30/20
3/14/20
Hatch 1
2/5/20
2/26/20
Browns Ferry 3
2/17/20
3/30/20
Calvert Cliffs 1
2/19/20
3/12/20
LaSalle 1
2/19/20
3/15/20
Brunswick 1
3/3/20
3/30/20
McGuire 2 (projected)
3/9/20
3/28/20
Robinson (projected)
3/9/20
4/3/20
Watts Bar 1 (projected)
3/9/20
4/5/20
Vogtle 1 (projected)
3/9/20
3/29/20
Fermi 2 (projected)
Changing to 24 month fuel during spring 2020 outage
3/16/20
4/14/20
Quad Cities 2
3/19/20
4/4/20
Millstone 2 (projected)
3/20/20
4/15/20
ANO 2 (projected)
3/23/20
4/23/20
Seabrook (projected)
3/24/20
4/20/20
Turkey Point 3 (projected)
3/24/20
4/22/20
Braidwood 2 (projected)
3/25/20
4/20/20
Limerick 1
3/26/20
4/20/20
Point Beach 2 (projected)
3/30/20
4/30/20
South Texas Project 1 (projected)
3/30/20
5/6/20
Palo Verde 2 (projected)
3/31/20
4/28/20
Susquehanna 1
3/31/20
5/4/20
Darlington 3
4/3/20
4/27/20
Salem 2 (projected)
4/3/20
4/28/20
VC Summer 1 (projected)
4/6/20
5/5/20
Grand Gulf
4/7/20
5/16/20
Pickering NGS 5
4/13/20
5/22/20
Beaver Valley 2 (projected)
Closing in 2021
4/13/20
5/12/20
Ginna (projected)
4/14/20
5/13/20
Nine Mile Point 2
4/16/20
5/18/20
Palisades (projected)
Just announced that they will remain open until 2022. There will be a fall outage in 18.
4/20/20
5/12/20
Surry 2 (projected)
4/20/20
5/26/20
Oconee 3
4/21/20
5/18/20
Sequoyah 2 (projected)
4/27/20
5/24/20
Clinton
4/30/20
5/19/20
Catawba 1 (projected)
5/11/20
6/5/20
Comanche Peak 2 (projected)
5/11/20
6/9/20
Bruce 3
5/20/20
6/11/20
Waterford 3 (projected)
6/29/20
7/28/20
Angra 1 (projected)
7/27/20
8/25/20
Diablo Canyon 1 (projected)
7/27/20
8/28/20
Laguna Verde 2 (projected)
8/26/20
9/24/20
North Anna 2 (projected)
8/26/20
9/30/20
DC Cook 1 (projected)
This will be the last baffle bolt outage, and the last long outage.
8/27/20
9/25/20
Turkey Point 4 (projected)
9/1/20
10/8/20
Pickering NGS 7 (projected)
9/3/20
10/12/20
Oyster Creek (projected)
9/7/20
9/19/20
Prairie Island 1 (projected)
9/10/20
10/12/20
Vogtle 2 (projected)
9/11/20
10/5/20
McGuire 1 (projected)
9/17/20
10/15/20
Cooper (projected)
9/18/20
10/27/20
Pt. Lepreau 1 (projected)
9/18/20
10/22/20
Callaway (projected)
9/28/20
10/27/20
Farley 2 (projected)
9/28/20
10/17/20
Palo Verde 1 (projected)
10/1/20
10/29/20
Point Beach 1 (projected)
10/1/20
10/26/20
Sizewell B (projected)
10/1/20
10/30/20
Comanche Peak 1 (projected)
10/2/20
10/26/20
Oconee 1 (projected)
10/2/20
10/27/20
Peach Bottom 2 (projected)
10/5/20
10/22/20
Salem 1 (projected)
10/7/20
11/5/20
Watts Bar 2 (projected)
10/7/20
11/10/20
Millstone 3 (projected)
10/9/20
11/9/20
Browns Ferry 1
NRC approved ~155MWe (494MWt) power uprate to take place during 2018 outage.  Total electrical output will be ~1250MWe.
10/13/20
11/24/20
Dresden 3 (projected)
10/20/20
11/5/20
Bruce 2 (projected)
11/20/20
12/19/20
Hatch 2 (projected)
1/26/21
3/6/21
LaSalle 2 (projected)
1/26/21
3/1/21
Calvert Cliffs 2 (projected)
2/2/21
2/23/21
Browns Ferry 2 (projected)
NRC approved ~155MWe (494MWt) power uprate to take place during 2019 outage.  Total electrical output will be ~1250MWe.
2/19/21
3/25/21
Susquehanna 2 (projected)
Final unit 2 699' feed water  heater change out alpha,bravo, and charlie.
2/22/21
3/28/21
North Anna 1 (projected)
2/22/21
3/22/21
St Lucie 1 (projected)
2/23/21
3/23/21
Laguna Verde 1 (projected)
2/26/21
3/27/21
River Bend (projected)
2/26/21
4/1/21
Catawba 2 (projected)
3/1/21
3/25/21
South Texas Project 2 (projected)
3/8/21
4/6/21
ANO 1 (projected)
3/8/21
4/14/21
Nine Mile Point 1 (projected)
3/8/21
3/28/21
Wolf Creek (projected)
3/15/21
4/13/21
Quad Cities 1 (projected)
3/16/21
3/31/21
Brunswick 2
3/18/21
4/14/21
Farley 1 (projected)
3/22/21
4/12/21
Palo Verde 3 (projected)
3/22/21
4/21/21
Sequoyah 1 (projected)
3/22/21
4/25/21
Braidwood 1 (projected)
3/24/21
4/10/21
Byron 1 (projected)
3/25/21
4/12/21
DC Cook 2 (projected)
3/25/21
4/23/21
Bruce B 6 (projected)
3/26/21
4/24/21
Hope Creek (projected)
3/29/21
4/19/21
Monticello (projected)
4/5/21
5/4/21
Shearon Harris (projected)
4/5/21
4/29/21
Darlington 1 (projected)
4/5/21
4/29/21
Limerick 2 (projected)
4/6/21
5/4/21
Surry 1 (projected)
4/6/21
4/30/21
Pickering NGS 1 (projected)
4/8/21
5/17/21
Bruce B 7 (projected)
4/26/21
5/25/21
Columbia Generating Station
5/13/21
6/16/21
Bruce B 5 (projected)
5/24/21
6/22/21
Diablo Canyon 2 (projected)
5/26/21
6/29/21
Darlington 4 (projected)
6/21/21
7/15/21
Bruce 4 (projected)
7/19/21
8/17/21
Pickering NGS 4 (projected)
10/1/21
11/9/21
Prairie Island 2 (projected)
10/4/21
10/31/21
Peach Bottom 3 (projected)
10/12/21
10/29/21
Oconee 2 (projected)
10/18/21
11/12/21
Dresden 2 (projected)
10/19/21
11/6/21
Bruce B 8 (projected)
12/24/21
1/22/22
Pickering NGS 6 (projected)
12/28/21
2/5/22
Bruce 1 (projected)
1/19/22
2/17/22
Hatch 1 (projected)
1/25/22
2/15/22
Browns Ferry 3 (projected)
2/7/22
3/8/22
Bruce 3 (projected)
2/8/22
3/2/22
Calvert Cliffs 1 (projected)
2/8/22
3/2/22
LaSalle 1 (projected)
2/8/22
3/5/22
Brunswick 1 (projected)
2/21/22
3/20/22
Quad Cities 2 (projected)
3/8/22
3/24/22
Limerick 1 (projected)
3/16/22
4/10/22
Susquehanna 1 (projected)
3/21/22
4/24/22
Darlington 3 (projected)
3/24/22
4/17/22
Grand Gulf (projected)
3/28/22
5/6/22
Pickering NGS 5 (projected)
4/4/22
5/13/22
Nine Mile Point 2 (projected)
4/6/22
5/8/22
Oconee 3 (projected)
4/11/22
5/8/22
Clinton (projected)
4/20/22
5/9/22
Browns Ferry 1 (projected)
NRC approved ~155MWe (494MWt) power uprate to take place during 2018 outage.  Total electrical output will be ~1250MWe.
10/3/22
11/1/22
Brunswick 2 (projected)
3/7/23
4/3/23
Columbia Generating Station (projected)
5/3/23
6/6/23

Ganttproject (2.8.8 Pilsen (build 2308))ganttproject.biz