[ Back ] [ The Roadtechs Electric Transmission and Distribution Job Board ] [ Help ] [Edit ] [Mark Position Closed ]
Field Construction Manager – Substation Expansion (345 kV / 280 MVA Transformer)
Location: Delhi, NY
Start: Dec 2025 | Duration: 12 months
Hours: 40+ hrs/week
Pay: $70/hr W2 or $80/hr 1099
Perks: Vehicle allowance/company vehicle, 3 wks PTO, 100% Medical & Vision (self), $60/mo cell reimbursement
Scope: Expansion of existing 2.5-bay BAAH substation to a 4-bay configuration with a new 280 MVA 345 kV transformer, new control house, A & B cable trenches, and connections to the adjacent 115 kV substation. The project is 60% complete, with the remaining work scheduled to be completed by the end of 2026.
Requirements: Experience in 345 kV substation construction, transformer installation, and control/protection systems. OSHA 30 required
Apply: Send resume to joselyn.espinosa@ptaginc.com — Ref: FCM #6636

© Copyright - Roadtechs®, LLC. - All rights reserved.
Use of the Roadtechs.com website implies compliance with the Roadtechs User
Agreement and acknowledgment of our Privacy Policy.
