home >> nuclear >> job board >> post

[Safeguards Engineer] Rad Work Protection Expert - Supporting PWR initial Fuel Load in UAE

[ Back ] [ The Roadtechs Nuclear Job Board ] [ Help ] [Edit ] [Mark Position Closed ]


We're supporting NAWAH's Barakah PWR initial fuel load and require 3 Rad Protection SME's.

- Duration is approximately 4-5 months
- Mobilization to site is scheduled for October 30th/2019
- Initial Fuel Load scheduled for February 2019

Scope of work:

-Eight (8) years of experience at radiation protection or radioactive waste management
-Understanding PWR radiation protection and radioactive waste management protocol
Set up best practicable process of waste clearance by;
-Providing fractionated process per waste types and sources
-Identifying best options for waste monitoring and nuclide analysis
-Documenting procedures and justifications of the suggested process -
-Set up and document best practicable Source Term Management

Program and Scaling Factor Program

-Assist Nawah to develop waste minimization plan by providing studies on anticipated amount of
waste according to existing and suggested options
-identify all hazardous substances (chemicals, explosives, chelates, etc. ) in terms of radioactive
waste and assess best practicable control procedure
-Assess best practical option and specifications for waste drums assay system at the storage
ensuring it can be adapted to existing building infrastructure
-Assess best practicable means for optimizing solid radioactive waste arising mindful of the limited
capacity in onsite waste storage and timescale for external disposal facility. Study may include
-How long to store resin and concentrates in tanks before solidification/packaging so as not to
preclude meeting future waste acceptance criteria,
-When to change filters (at LLW threshold or DP)
-Feasibility of opening up waste shipment to disposal facility, etc.
- Radiation Protection expert will be assigned to projects/initiatives such as;
- Review ALARA measures and develop long term ALARA plan
- Carry forward remote monitoring system (Tele-dosimetry) introduction project.
- Set up gamma sensitive detector of portal monitor and develop relevant
procedure
- Set up Small Article Monitor and develop relevant procedure
- Developed ALARA plan for initial fuel load




[ Back ] [ The Roadtechs Nuclear Job Board ] [ Help ] [Edit ] [Mark Position Closed ]


© Copyright - Roadtechs®, LLC. - All rights reserved.
Use of the Roadtechs.com website implies compliance with the Roadtechs User Agreement and acknowledgment of our Privacy Policy.